Business analysis glossary
53 business analysis terms explained in plain English, from acceptance criteria to wireframes. Search, or jump to a letter.
A
- A/B testing
- Showing two versions of something to similar groups of users and measuring which performs better against an agreed metric. Read more →
- Acceptance criteria
- The conditions a user story must meet to be accepted as done. They make a requirement testable, often written as Given / When / Then.
- Agile
- Delivering work in short cycles with frequent feedback, so the plan can change as the team learns. Read more →
- As-is (current state)
- How a process or system works today, warts and all. You map it before designing the future state.
B
- Backlog
- The prioritised list of everything the team might build, from big epics to small fixes.
- BPMN
- Business Process Model and Notation: a standard set of shapes for drawing process maps that everyone can read the same way.
- BRD (Business Requirements Document)
- Describes what the business needs and why: objectives, scope, stakeholders and high-level requirements, without saying how it will be built.
- Business case
- The argument for doing a project: the problem, the options, costs, benefits and risks, and a recommendation.
C
- Change request
- A formal request to change agreed scope, so its impact on time, cost and quality can be assessed before anyone says yes.
D
- Data dictionary
- A reference listing every field in a dataset: its name, meaning, type, source and rules. It stops people reading the same number in different ways.
- Decision table
- A table of business rules: each row sets conditions and the outcome when they are met. Business staff can read and change it without touching code. The DMN standard defines how they work.
- Definition of Done
- The checklist a piece of work must pass before the team calls it finished, such as tested, reviewed and documented.
- Definition of Ready
- The checklist a user story must meet before it can enter a sprint: a clear user, a reason and testable acceptance criteria.
- DPIA (Data Protection Impact Assessment)
- A UK GDPR assessment of the privacy risks of a new process or system, carried out before it starts. It is required when processing is likely to be high risk, for example when AI is used on personal data.
E
- Elicitation
- Drawing out requirements from stakeholders through interviews, workshops, observation, surveys and document analysis.
- Epic
- A large piece of work that's too big for one sprint, broken down into smaller user stories.
F
- Fishbone diagram
- A root-cause diagram (also called Ishikawa) that groups possible causes of a problem into categories such as people, process and technology.
- Fit-gap analysis
- Comparing what a product does out of the box with what the business needs, to decide what to configure, build or change. Read more →
- Five whys
- Asking 'why?' repeatedly, usually about five times, to get from a symptom to its root cause.
- FRD (Functional Requirements Document)
- Describes how a system should behave: features, rules, inputs, outputs and edge cases, detailed enough for developers and testers.
G
- Gap analysis
- Comparing the current state with the desired future state to identify what has to change.
H
- Human in the loop
- A design where AI or automation makes a suggestion but a person checks it and makes the final decision. Used where mistakes are costly or the law expects human judgement.
K
- Kanban
- Managing work as a continuous flow on a board, with limits on how much is in progress at once. Read more →
- KPI (Key Performance Indicator)
- A measurable value that shows whether a process or project is meeting its goals.
M
- MoSCoW
- A prioritisation technique: Must have, Should have, Could have, Won't have (this time). Read more →
- MVP (Minimum Viable Product)
- The smallest version of a product that delivers value and lets you learn from real users.
N
- Non-functional requirement
- How well a system must work rather than what it does: performance, security, availability, accessibility.
O
- Options appraisal
- Comparing several ways to solve a problem, including doing nothing, against agreed criteria such as cost, risk and benefit, so the recommendation can be justified.
P
- Pain point
- A specific problem people run into in the current process, such as a delay, re-keying or a missing update. Each one is logged with evidence so it can be traced to a requirement.
- PESTEL
- Analysing external factors: Political, Economic, Social, Technological, Environmental and Legal. Read more →
- Pilot
- A small, time-limited trial of a change with real users, measured against agreed success criteria, before deciding whether to roll it out.
- Power/interest grid
- A 2x2 map of stakeholders by how much influence they have and how interested they are. It shows who to manage closely, keep satisfied, keep informed or monitor.
- Problem statement
- A short, agreed description of the problem, who it affects, its impact and what a good solution would achieve. It keeps the team focused on the problem rather than a favourite solution.
- Process mapping
- Drawing the steps, decisions and hand-offs in a process to understand and improve it. Read more →
- Product owner
- The person in a Scrum team who owns the backlog and decides what gets built next.
- Prototype
- A working or clickable model of a screen or system, built to test an idea with users before it is fully built. More detailed than a wireframe. Read more →
R
- RACI
- A matrix showing who is Responsible, Accountable, Consulted and Informed for each task or decision.
- Requirements traceability matrix
- A table linking each requirement to its source, design and test cases, so nothing is missed or built without a reason.
- Root cause analysis
- Finding the underlying reason a problem happens, not just its symptoms.
S
- Scope creep
- Uncontrolled growth in what a project is expected to deliver, usually without more time or budget.
- Scrum
- An Agile framework that delivers work in fixed sprints, with set roles (product owner, Scrum master, team) and set meetings. Read more →
- Sign-off
- Formal agreement from stakeholders that requirements or a delivered solution are accepted.
- Sprint
- A fixed period, usually one to four weeks, in which a Scrum team delivers a set of backlog items.
- Stakeholder
- Anyone affected by, or able to influence, a project or its outcome.
- Stakeholder analysis
- Identifying stakeholders and mapping their interest and influence, to plan how to engage each one.
- SWOT
- Strengths, Weaknesses, Opportunities and Threats: a quick strategic assessment. Read more →
T
- To-be (future state)
- How a process or system should work after the change.
U
- UAT (User Acceptance Testing)
- Business users testing a solution in real scenarios before it goes live. Read more →
- Use case
- A description of how a user interacts with a system to achieve a goal, including alternative and error paths.
- User story
- A short requirement from the user's point of view: As a [user], I want [goal] so that [reason]. Read more →
W
- Waterfall
- Delivering in sequential stages, each signed off before the next begins. Read more →
- Wireframe
- A simple, low-detail sketch of a screen layout used to agree structure before visual design. Read more →
- Workshop
- A facilitated session where stakeholders work together to elicit, prioritise or agree requirements. Read more →
No matching terms. Try a shorter word.